BenefitsSST-100- Cost effective, high reliable solution
- Fast and early layout planning
- Short delivery times because of highly predefined design of both turboset and package
- Short on-site erection: turbine skid and gearbox / oil unit fully assembled in the workshop before shipping to site
- Compact design - oil system fully integrated into the base frame
- Proven components: highly standardized, robust blading; reduction gears taken from the existing range of world-class gear manufacturers
- Increased safety: no leaks towards hot pipes; oil and steam piping separated
- Easy maintenance with low maintenance costs
|